Aplicación del método Pert en la fabricación de zapatillas en la empresa artesanal creaciones Leo.

Mostrar el registro sencillo del ítem

dc.contributor.advisor Pacheco Molina, Andrés Marcelo
dc.contributor.author Yunga Solano, Monica Silvana
dc.date.accessioned 2019-02-11T21:48:54Z
dc.date.available 2019-02-11T21:48:54Z
dc.date.issued 2019
dc.identifier.citation Yunga Solano, M.S. (2019) Aplicación del método Pert en la fabricación de zapatillas en la empresa artesanal creaciones Leo. (Examen Complexivo). Universidad Técnica de Machala, Machala, Ecuador. es_ES
dc.identifier.other ECUACE-2019-AE-DE00475
dc.identifier.uri http://repositorio.utmachala.edu.ec/handle/48000/13479
dc.description Uno de los métodos más utilizados en la programación de proyectos a lo largo del tiempo ha sido PERT que ha servido como herramienta para el monitoreo y control del cumplimiento de las tareas que conforman un proyecto. La presente investigación tuvo como objetivo aplicar el método PERT en la fabricación de zapatillas mediante la determinación de las actividades y su duración estimada para el uso eficiente de los recursos. En la tabla de actividades se consideró la incertidumbre en la duración y la sucesión y dependencia de las mismas ,la graficación de la red ayudó a la determinación de la ruta crítica que recayó en las actividades A-D-F-G-H-I , el cálculo de varianza y la tabla de distribución normal sirvieron como herramientas para obtener la información necesaria y finalmente determinar el tiempo de culminación del proyecto en la empresa objeto de estudio dando como resultado un periodo de 323.33 minutos que de acuerdo a la ruta crítica representa al 50% de grado de confianza, se aumentó algunas unidades de tiempo con lo que se obtuvo un aumento en el grado de certeza del cumplimiento de la entrega, el cual se evidencia gráficamente en el presente documento. es_ES
dc.description.abstract One of the most used methods in the programming of projects over time has been PERT that has served as a tool for monitoring and control of compliance with the tasks that make up a project. The objective of the present investigation was to apply the PERT method in the manufacture of slippers by determining the activities and their estimated duration for the efficient use of resources. In the table of activities the uncertainty in the duration and the succession and dependence of the same was considered, the graphification of the network helped to determine the critical route that fell in the ADFGHI activities, the calculation of variance and the distribution table Normally they served as tools to obtain the necessary information and finally to determine the time of culmination of the project in the company under study, resulting in a period of 323.33 minutes, which according to the critical path represents a 50% confidence level. some units of time with what was obtained an increase in the degree of certainty of fulfillment of delivery, which is evidenced graphically in this document. es_ES
dc.format.extent 27 h. es_ES
dc.language.iso es es_ES
dc.rights openAccess es_ES
dc.rights.uri https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ es_ES
dc.subject PROYECTO es_ES
dc.subject MÉTODO PERT es_ES
dc.subject RUTA CRÍTICA es_ES
dc.title Aplicación del método Pert en la fabricación de zapatillas en la empresa artesanal creaciones Leo. es_ES
dc.type Examen Complexivo es_ES
dc.email myunga_est@utmachala.edu.ec es_ES
dc.cedula 0705237774 es_ES
dc.utmachtitulacion.titulacion Examen complexivo es_ES
dc.utmachbibliotecario.bibliotecario Cunalata Claudia es_ES
dc.utmachproceso.proceso PT-011018 (2018-2) es_ES


Ficheros en el ítem

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

openAccess Excepto si se señala otra cosa, la licencia del ítem se describe como openAccess

Buscar en DSpace


Búsqueda avanzada

Listar

Mi cuenta

Estadísticas