Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.utmachala.edu.ec/handle/48000/20693
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Herrera Freire, Alexander Geovanny | - |
dc.contributor.author | Berrospi Rodas, Paola Vanessa | - |
dc.date.accessioned | 2023-03-09T20:15:59Z | - |
dc.date.available | 2023-03-09T20:15:59Z | - |
dc.date.issued | 2022 | - |
dc.identifier.citation | Berrospi Rodas , PV. (2022) Aplicación de la NICSP 11 en el registro de contratos de construcción del GAD parroquial Ayapamba en el período 2022. (examen complexivo). UTMACH, Facultad De Ciencias Empresariales, Machala, Ecuador. | es_ES |
dc.identifier.other | E-13142_BERROSPI RODAS PAOLA VANESSA | - |
dc.identifier.uri | http://repositorio.utmachala.edu.ec/handle/48000/20693 | - |
dc.description | El Ecuador fue uno de los países de Latinoamérica que planeaba implementar las Normas Internacionales de Contabilidad del Sector Público (NICSP) como su marco normativo contable para la preparación y presentación de los estados financieros del sector a partir del 2020, según el Instructivo para la convergencia de la Normativa de Contabilidad Gubernamental a NICSP, emitido el 8 de abril del 2019 por el Ministerio de Economía y Finanzas. La implementación de las NICSP se ha realizado de manera progresiva, con la adopción de diferentes bloques de normas a lo largo de los meses. Aunque el Ecuador planeaba implementar la NICSP a partir de 2020, la política pública retrasó este proceso hasta 2022. El objetivo de esta investigación es aplicar la Norma Internacional de Contabilidad del Sector Público 11 (NICSP 11) en el registro de contratos de construcción del GAD Parroquial de Ayapamba durante el periodo 2022, este se llevará a cabo con la resolución de un caso práctico en el cual se contrata a la Empresa ORFOXT EP. para la construcción de un mini coliseo y la existencia de un anticipo por parte del GAD Parroquial de Ayapamba. La investigación llevada a cabo es del tipo descriptivo y como instrumento de investigación usaremos el bibliográfico en la revisión de material como artículos científicos y libros. Los resultados muestran el correcto tratamiento contable que se debe realizar en los casos de contratos de construcción con anticipos siguiendo los lineamientos de la NICSP 11. | es_ES |
dc.description.abstract | Ecuador was one of the Latin American countries that planned to implement the International Public Sector Accounting Standards (IPSAS) as its accounting regulatory framework for the preparation and presentation of the financial statements of the sector as of 2020, according to the Instructions for convergence of the Government Accounting Regulations to IPSAS, issued on April 8, 2019, by the Ministry of Economy and Finance. The implementation of the IPSAS has been carried out progressively, with the adoption of different blocks of standards over the months. Although Ecuador planned to implement IPSAS as of 2020, public policy delayed this process until 2022. The objective of this research is to apply International Public Sector Accounting Standard 11 (IPSAS 11) in the registration of GAD construction contracts. Parroquial de Ayapamba during the 2022 period, this will be carried out with the resolution of a practical case in which the ORFOXT EP Company is hired. for the construction of a mini coliseum and the existence of an advance by the Ayapamba Parish GAD. The research carried out is of the descriptive type and as a research instrument we will use the bibliographic in the review of material such as scientific articles and books. The results show the correct accounting treatment that must be carried out in the cases of construction contracts with advance payments following the guidelines of IPSAS 11. | es_ES |
dc.language.iso | es | es_ES |
dc.publisher | Machala : Universidad Técnica de Machala | es_ES |
dc.rights | openAccess | es_ES |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
dc.subject | NICSP 11 | es_ES |
dc.subject | CONTRATOS DE CONSTRUCCIÓN | es_ES |
dc.subject | CONTABILIDAD GUBERNAMENTAL | es_ES |
dc.subject | COSTOS DE CONTRATACIÓN, | es_ES |
dc.title | Aplicación de la NICSP 11 en el registro de contratos de construcción del GAD parroquial Ayapamba en el período 2022. | es_ES |
dc.type | Examen Complexivo | es_ES |
dc.email | pberrospi1@utmachala.edu.ec | es_ES |
dc.cedula | 0151796612 | es_ES |
dc.utmachtitulacion.titulacion | Examen complexivo | es_ES |
dc.utmachbibliotecario.bibliotecario | Cunalata Claudia | es_ES |
dc.utmachproceso.proceso | PT-171022 (2022-2 TC) | es_ES |
Aparece en las colecciones: | Examen Complexivo Contabilidad y Auditoría |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
E-13142_BERROSPI RODAS PAOLA VANESSA.pdf | E-13142_BERROSPI RODAS PAOLA VANESSA | 1,27 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons