Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.utmachala.edu.ec/handle/48000/19551
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Carrillo Landín, Angel Antonio | - |
dc.contributor.author | Ugarte Valarezo, Bismark Alexei | - |
dc.date.accessioned | 2022-09-08T13:41:08Z | - |
dc.date.available | 2022-09-08T13:41:08Z | - |
dc.date.issued | 2022 | - |
dc.identifier.other | ECFIC-2022-IC-DE00070 | - |
dc.identifier.uri | http://repositorio.utmachala.edu.ec/handle/48000/19551 | - |
dc.description | Las obras civiles generan impactos ambientales durante la intervención y modificación en el sitio de implantación, se producen diversas alteraciones. Estos cambios tienden a causar impactos negativos en el ecosistema cercano debido a la generación de contaminantes y residuos de materiales de construcción que son debidamente desechados o recolectados. En el presente informe, se muestra el desarrollo y el resultado de la evaluación del impacto ambiental (EIA) para las 3 etapas de ejecución, las cuales son, construcción de cunetas y bordillos, mejoramiento de vías y reparación de redes de agua potable y alcantarillado sanitario en el sitio San Vicente – El Jobo del cantón Arenillas. Con la evaluación de impacto ambiental que se realiza mediante matrices de cumplimiento de la normativa ambiental, el plan de manejo ambiental, se identificó las observaciones generadas por cada actividad o rublo del proyecto. Con los resultados se permitió conocer el criterio de toda actividad o práctica que se desarrolla dentro de los parámetros del plan de manejo ambiental para salvaguardar los factores ambientales, la alteración del paisaje. Aguas naturales, riesgos - salud humana y calidad de salud. En proyectos de mejoramiento de vías y la implementación de tuberías subterráneas son los factores ambientales que mayor incidencia que tiene una obra, como son los movimientos de tierras (desalojo y mejoramiento de capas), pavimentación de la capa de rodadura y la implementación de redes de abastecimiento de agua potable y red sanitaria. Las afectaciones son de carácter temporal, pero con consecuencias positivas para el sector. | es_ES |
dc.description.abstract | Civil works generate environmental impacts during the intervention and modification at the implantation site, various alterations are produced. These changes tend to cause negative impacts on the nearby ecosystem due to the generation of pollutants and waste from construction materials that are properly disposed of or collected. This report shows the development and the result of the environmental impact assessment (EIA) for the 3 stages of execution, which are. construction of gutters and curbs, improvement of roads and repair of drinking water and sewage networks. toilet at the San Vicente – El Jobo site in the Arenillas canton. With the environmental impact assessment that is carried out through matrices of compliance with environmental regulations, the environmental management plan, the observations generated by each activity or ruble of the project were identified. With the results, it was possible to know the criteria of any activity or practice that is developed within the parameters of the environmental management plan to safeguard the environmental factors, the alteration of the landscape. Natural waters, risks - human health and quality of health. In road improvement projects and the implementation of underground pipes, these are the environmental factors that have the greatest impact on a work, such as earthworks (eviction and improvement of layers), paving of the wearing course and the implementation of networks of drinking water supply and sanitary network. However, the effects are temporary, but with positive consequences for the sector. | es_ES |
dc.format.extent | 30 p. | es_ES |
dc.language.iso | es | es_ES |
dc.rights | openAccess | es_ES |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
dc.subject | CARRETERA | es_ES |
dc.subject | FACTOR AMBIENTAL | es_ES |
dc.subject | IMPACTO AMBIENTAL | es_ES |
dc.subject | IMPLANTACION | es_ES |
dc.title | Evaluación ambiental mejoramiento calles y reparación tuberías AA.SS y AA.PP sitio San Vicente, Arenillas | es_ES |
dc.email | bugarte_est@utmachala.edu.ec | es_ES |
dc.cedula | 0703987461 | es_ES |
dc.utmachtitulacion.titulacion | Examen complexivo | es_ES |
dc.utmachbibliotecario.bibliotecario | Peralta Mercy | es_ES |
dc.utmachproceso.proceso | PT-280322 (2022-1) | es_ES |
Aparece en las colecciones: | Examen Complexivo Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
ECFIC-2022-IC-DE00070.pdf | EXAMEN COMPLEXIVO | 1,84 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons