Por favor, use este identificador para citar o enlazar este ítem:
http://repositorio.utmachala.edu.ec/handle/48000/16852
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Carrillo Landín, Angel Antonio | - |
dc.contributor.author | Yépez Romero, Carlos Eduardo | - |
dc.date.accessioned | 2021-05-20T03:58:26Z | - |
dc.date.available | 2021-05-20T03:58:26Z | - |
dc.date.issued | 2021 | - |
dc.identifier.other | ECFIC-2021-IC-DE-00017 | - |
dc.identifier.uri | http://repositorio.utmachala.edu.ec/handle/48000/16852 | - |
dc.description | El presente proyecto de titulación tiene como principal objetivo elaborar un presupuesto, fórmula polinómica, cuadrilla tipo y cronograma de avance físico, valorado de trabajos, de utilización de mano de obra, equipo y materiales, utilizando el método pert de un proyecto relacionado con el control de inundaciones. El sitio donde se ubica la problemática se enfoca en el barrio 10 de Septiembre, proponiendo un canal abierto que sirva como vía de transición para evacuar de manera rápida y oportuna las aguas lluvias, para desarrollar el presente trabajo se realizaron análisis de costos ya sea directos e indirectos, encajando dentro de ello todos los procesos de programación de obras para de tal forma poder determinar el valor total del presupuesto de obra, a su vez realizar el reajuste de precios utilizando la fórmula polinómica. Con todo ello se espera poder solucionar la problemática ya que al momento de no dar solución al problema común en todas las familias que habitan en el barrio 10 de septiembre, se producen muchos problemas, que afectan a la salud de las personas y en su calidad de vida. | es_ES |
dc.description.abstract | The main objective of this degree project is to prepare a budget, polynomial formula, type crew and schedule of physical progress, value of jobs, use of labor, equipment and materials, using the pert method of a project related to control of floods. The site where the problem is located is focused on the 10 de septiembre neighborhood, proposing an open channel that serves as a transition path to evacuate rainwater quickly and in a timely manner, to develop this work, cost analyzes were carried out either direct and indirect, fitting within it all the works scheduling processes in order to determine the total value of the work budget, in turn making the price readjustment using the polynomial formula. With all this, it is hoped to be able to solve the problem since at the time of not giving a solution to the common problem in all the families that live in the 10 de Septiembre neighborhood, many serial problems occur, which affect the health of the women in many ways. people and the quality of life they lead. | es_ES |
dc.format.extent | 72 p. | es_ES |
dc.language.iso | es | es_ES |
dc.rights | openAccess | es_ES |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
dc.subject | PROGRAMACIÓN DE OBRA | es_ES |
dc.subject | PRESUPUESTO | es_ES |
dc.subject | INUNDACION | es_ES |
dc.subject | CAMBIO CLIMATICO | es_ES |
dc.title | Presupuesto y cronogramas aplicando método pert. proyecto canal abierto y alcantarillado Barrio 10 de Septiembre, Machala, El Oro. | es_ES |
dc.type | Examen Complexivo | es_ES |
dc.email | cyepez_est@utmachala.edu.ec | es_ES |
dc.cedula | 0705526614 | es_ES |
dc.utmachtitulacion.titulacion | Examen complexivo | es_ES |
dc.utmachbibliotecario.bibliotecario | Peralta Mercy | es_ES |
dc.utmachproceso.proceso | PT-141220 (2020-2) | es_ES |
Aparece en las colecciones: | Examen Complexivo Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
ECFIC-2021-IC-DE-00017.pdf | EXAMEN COMPLEXIVO | 21,21 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons