DSpace logo

Por favor, use este identificador para citar o enlazar este ítem: http://repositorio.utmachala.edu.ec/handle/48000/13181
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCarrillo Landín, Angel Antonio-
dc.contributor.authorTorres Pérez, Kelvin Manuel-
dc.date.accessioned2018-09-04T18:30:08Z-
dc.date.available2018-09-04T18:30:08Z-
dc.date.issued2018-
dc.identifier.citationTorres Perez, K.M. (2018) Precio y cronogramas aplicando el método pert en la construcción muro de gaviones, del rio Salitre, cantón Salitre, Guayas. (examen complexivo). UTMACH, Unidad Académica de Ingeniería Civil, Machala, Ecuador. 52 p.es_ES
dc.identifier.urihttp://repositorio.utmachala.edu.ec/handle/48000/13181-
dc.descriptionEn este trabajo nos enfocamos en la planificación y programación del proyecto “Muro de Gaviones” del rio salitre cantón salitre provincia Guayas, para ello utilizaremos el método PERT (Project Evaluation and Review Techniques), un método en el cual está presente la incertidumbre, para empezar, es necesario tener dos documentos muy importantes los cuales son el presupuesto y el APU. Al iniciar la planificación es necesario en listar las actividades, en este proyecto existe un numero de 10 actividades, procedemos a realizar la tabla de secuencia en la cual nos muestra las diferentes sucesiones de las actividades, con eso podemos realizar el diagrama de flechas. Una vez terminada la fase de la planificación la cual consta hasta el diagrama de flechas, entramos a la fase de programación, realizamos la tabla de duraciones, mediante los rendimientos de cada actividad, la cantidad de obra, el número de grupos, la duración en horas, y por último la duración en días, esta tabla se la realizo para tomar la duración encontrada como referencia para nuestro tiempo más probable. Elaboramos la tabla de tiempos probabilísticos los cuales son el tiempo optimista, más probable y pesimista, una vez realizado esto procedemos a calcular la desviación estándar y la varianza. Teniendo todos los datos calculados podemos unir con el diagrama de flechas de la planificación y encontrar la ruta crítica, esta nos indica el plazo del proyecto, finalmente procedemos a graficar los cronogramas de avance físico, valorado y trabajos, cronogramas de materiales, mano de obra y materiales.es_ES
dc.description.abstractIn this work we focus on the planning and programming of the "Gabion Wall" project of the saltpeter river in the canton of Guayas province saltpeter, for this we will use the PERT method (Project Evaluation and Review Techniques), a method in which uncertainty is present, to begin with, it is necessary to have two very important documents which are the budget and the APU. When starting the planning it is necessary to list the activities, in this project there are a number of 10 activities, we proceed to make the sequence table in which it shows us the different successions of the activities, with that we can make the diagram of arrows. Once the planning phase is finished, which consists of the diagram of arrows, we enter the programming phase, we make the table of durations, through the performance of each activity, the amount of work, the number of groups, the duration in hours, and finally the duration in days, this table is made to take the duration found as a reference for our most likely time. We elaborate the table of probabilistic times which are the optimistic, most probable and pessimistic time, once this is done we proceed to calculate the standard deviation and the variance. Having all the data calculated we can join with the planning arrow diagram and find the critical path, this indicates the project deadline, finally we proceed to graph the schedules of physical progress, valued and works, material schedules, labor and materials.es_ES
dc.format.extent52 p.es_ES
dc.language.isoeses_ES
dc.publisherMachala : Universidad Técnica de Machalaes_ES
dc.rightsopenAccesses_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
dc.subjectPLANIFICACIONes_ES
dc.subjectPROGRAMACIONes_ES
dc.subjectGAVIONESes_ES
dc.subjectPERTes_ES
dc.titlePrecio y cronogramas aplicando el método pert en la construcción muro de gaviones, del rio Salitre, cantón Salitre, Guayas.es_ES
dc.typeExamen Complexivoes_ES
dc.emailkmtorresp_est@utmachala.edu.eces_ES
dc.emailacarrillo@utmachala.edu.eces_ES
dc.cedula0705639680es_ES
dc.cedula0701210668es_ES
dc.utmachtitulacion.titulacionExamen complexivoes_ES
dc.utmachbibliotecario.bibliotecarioAlvarado Jazmanyes_ES
dc.utmachproceso.procesoPT-010518 (2018-1)es_ES
Aparece en las colecciones: Examen Complexivo Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
E-8811_TORRES PEREZ KELVIN MANUEL.pdfExamen complexivo5,41 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons